Grant Gardens
1558 Grant Ave
Port Coquitlam, BC V3B 1P2 · Strata Plan LMS2512
Grant Gardens is a strata building at 1558 Grant Ave in Port Coquitlam, BC, built in 1997, registered under strata plan LMS2512. This page surfaces the public-registry data we have on the building plus preliminary risk signals derived from construction era, size, and location. For the actual condo fees, special levy history, contingency reserve fund balance and building envelope status, you’ll need the strata document package — request it through your realtor and upload it to SearchStrata for an AI-powered analysis.
General information
- Type
- condo
- Year built
- 1997 (29 years old)
- Floor count
- 4
- Strata plan #
- LMS2512
Preliminary risk signals
These are derived from public registry data — construction era, size, location, and report status. They are not a substitute for reading the actual strata document package, which is where the real risks live.
Rainscreen / leaky-condo era (1985-2000)
elevatedBuilt 1997. Buildings from this era frequently have building envelope history — some remediated, some partially, some not. Check the depreciation report and any engineering reports for completed and outstanding envelope scope.
About this information
Building data is compiled from public land title, municipal, and strata registry sources. It is provided for informational purposes and is not legal, financial, or real estate advice. Always verify against the strata corporation’s official documents (Form B, bylaws, financial statements, depreciation report, minutes) before making a purchase decision.
Condo fees and strata fees
Monthly fees at 1558 Grant Ave are set by the strata corporation’s annual budget, approved at the AGM, and disclosed in the Form B information certificate. They cover operating costs (insurance, utilities, management, maintenance) and contributions to the Contingency Reserve Fund. To see the actual current figure and the fee trajectory over recent years, you need the budget, financial statements, and recent AGM minutes.
Special levy history
A special levy is a one-time assessment for unbudgeted capital work — envelope remediation, roofing, plumbing, parkade. The history of special levies (and the levies projected in the depreciation report) is the single best signal for what living at Grant Gardens might cost over the next 5–10 years. SearchStrata extracts the full levy history from minutes and AGM packages with page-level citations.
Reserve fund & depreciation report
Most strata corporations in BC are required to maintain a depreciation report refreshed every five years. The report projects 30 years of capital expenditures; the Contingency Reserve Fund (CRF) balance versus the report’s recommended contributions tells you whether owners are saving fast enough for what’s coming.
Frequently asked questions about Grant Gardens
When was Grant Gardens built?
Grant Gardens was built in 1997, making it approximately 29 years old. Construction era is a key signal in BC because buildings from the 1985–2000 rainscreen window often carry building-envelope history, while post-2010 buildings are typically still inside the 2-5-10 New Home Warranty period for structural items.
What is the strata plan number for Grant Gardens?
Grant Gardens is registered under strata plan LMS2512. The prefix identifies the registration era (NWS = older, EPS/BCS = newer post-2010 registrations under the Strata Property Act). The strata plan defines the boundaries of common property, limited common property, and individual strata lots and is referenced throughout the Form B information certificate and bylaws.
How can I find the condo fees and special levy history for Grant Gardens?
Current monthly condo / strata fees, the special levy history, and the contingency reserve fund balance are not in any public registry — they live in the strata corporation's document package: the Form B information certificate, financial statements, recent AGM minutes, and the depreciation report. Request the package through your realtor (or directly via the strata management company) and upload it to SearchStrata to get every figure extracted and explained with page-level citations.
Is Grant Gardens affected by the BC leaky-condo era?
Grant Gardens was built in 1997, inside the rainscreen-era window (roughly 1985–2000) when many BC buildings developed building envelope failures. Whether this specific building has been remediated, partially remediated, or still has outstanding scope can only be confirmed from the depreciation report and any engineering reports commissioned by the strata. SearchStrata reads those reports and extracts completed and outstanding envelope scope with the dollar figures discussed in minutes.
Other strata buildings in Port Coquitlam
Researching multiple buildings? These nearby strata corporations are in the same city.
Fremont Blue — 2325 Ranger Lane
Port Coquitlam · V3B 0K7
Built 2015630 unitsEPS1809Fremont Blue — 2332 Ranger Lane
Port Coquitlam · V3B 0J4
Built 2013630 unitsEPS1127Links — 2418 Avon Pl
Port Coquitlam · V3B 0C7
Built 2009137 unitsBCS3049Citadel Pointe — 678 Citadel Dr
Port Coquitlam · V3C 6M7
Built 2001120 unitsLMS3766Country Park Estates — 2450 Hawthorne Ave
Port Coquitlam · V3C 6B3
Built 1990115 unitsNWS3363Brimley Mews — 1661 Fraser Ave
Port Coquitlam · V3B 0B6
Built 200781 unitsBCS2630