Dunbar Heights

3590 26th Ave W

Vancouver, BC V6S 1N9 · Strata Plan LMS2798

Dunbar Heights is a 34-unit strata building at 3590 26th Ave W in Vancouver, BC, built in 1997, registered under strata plan LMS2798. This page surfaces the strata registry data we have on the building plus preliminary risk signals derived from construction era, size and depreciation report status. Location Insights scores the area around the building separately. For the actual condo fees, special levy history, contingency reserve fund balance and building envelope status, you’ll need the strata document package — request it through your realtor and upload it to SearchStrata for an AI analysis.

General information

Strata registry record

Everything below is on file for this building. Coverage is uneven and much is still missing — know something we don’t? Suggest it, and a person reviews it before anything publishes.

Building / complex name
Dunbar Heights
Year built
1997 (29 years old)
Strata lots (units)
34
Storeys
4
Strata plan #
LMS2798
Management company
Associa British Columbia
Postal code
V6S 1N9
Not on file yet (5)
Exterior cladding
unknown
Roof
unknown
Rain screen
unknown
Envelope remediation
unknown
Pets
unknown
Addresses in this strata corporation (7)
  • 3590 26th Ave W, Vancouver V6S 1N9
  • 3590 W 26th Ave, Vancouver V6S 1N9
  • 4200 Dunbar St, Vancouver V6S 2E9
  • 4210 Dunbar St, Vancouver V6S 2E9
  • 4220 Dunbar St, Vancouver V6S 2E9
  • 4238 Dunbar St, Vancouver V6S 2E9
  • 4250 Dunbar St, Vancouver V6S 2E9

Location Insights

Hazard

66/100

Measured around 3590 26th Ave W from public data. Not part of the document analysis, and not included in any report grade.

  • Wildfire threat class0 class
  • Seismic hazard (peak ground acceleration)0.483 g
  • Historical wildfire within 5 km258.7 ha

1 further hazard signal could not be measured here — reported as a gap, never as a zero.

Source: Historical wildfire perimeters · BC Wildfire PSTA Fire Threat Rating · Canadian National Seismic Hazard Model (NBCC 2020 values)

Preliminary risk signals

These are derived from public registry data — construction era, size and depreciation report status. They are not a substitute for reading the actual strata document package, which is where the real risks live.

  • Rainscreen / leaky-condo era (1985-2000)

    elevated

    Built 1997. Buildings from this era frequently have building envelope history — some remediated, some partially, some not. Check the depreciation report and any engineering reports for completed and outstanding envelope scope.

  • Mid-size strata

    info

    34 units. Typical Metro Vancouver / Calgary / Edmonton strata size.

About this information

Building data is compiled from public land title, municipal, and strata registry sources. It is provided for informational purposes and is not legal, financial, or real estate advice. Always verify against the strata corporation’s official documents (Form B, bylaws, financial statements, depreciation report, minutes) before making a purchase decision.

Last enriched:

Condo fees and strata fees

Monthly fees at 3590 26th Ave W are set by the strata corporation’s annual budget, approved at the AGM, and disclosed in the Form B information certificate. They cover operating costs (insurance, utilities, management, maintenance) and contributions to the Contingency Reserve Fund. To see the actual current figure and the fee trajectory over recent years, you need the budget, financial statements, and recent AGM minutes.

Special levy history

A special levy is a one-time assessment for unbudgeted capital work — envelope remediation, roofing, plumbing, parkade. The history of special levies (and the levies projected in the depreciation report) is the single best signal for what living at Dunbar Heights might cost over the next 5–10 years. SearchStrata extracts the full levy history from minutes and AGM packages with page-level citations.

Reserve fund & depreciation report

As a BC strata with 34 units, this building is generally required to maintain a depreciation report refreshed every five years. The report projects 30 years of capital expenditures; the Contingency Reserve Fund (CRF) balance versus the report’s recommended contributions tells you whether owners are saving fast enough for what’s coming.

Frequently asked questions about Dunbar Heights

When was Dunbar Heights built?

Dunbar Heights was built in 1997, making it approximately 29 years old. Construction era is a key signal in BC because buildings from the 1985–2000 rainscreen window often carry building-envelope history, while post-2010 buildings are typically still inside the 2-5-10 New Home Warranty period for structural items.

How many units are in Dunbar Heights?

Dunbar Heights has 34 units across 4 floors. Unit count matters because capital costs (roofing, envelope, parkade work) are split across every owner — smaller buildings concentrate cost per unit, larger ones spread it.

What is the strata plan number for Dunbar Heights?

Dunbar Heights is registered under strata plan LMS2798. The prefix identifies the registration era (NWS = older, EPS/BCS = newer post-2010 registrations under the Strata Property Act). The strata plan defines the boundaries of common property, limited common property, and individual strata lots and is referenced throughout the Form B information certificate and bylaws.

How can I find the condo fees and special levy history for Dunbar Heights?

Current monthly condo / strata fees, the special levy history, and the contingency reserve fund balance are not in any public registry — they live in the strata corporation's document package: the Form B information certificate, financial statements, recent AGM minutes, and the depreciation report. Request the package through your realtor (or directly via the strata management company) and upload it to SearchStrata to get every figure extracted and explained with page-level citations.

Is Dunbar Heights affected by the BC leaky-condo era?

Dunbar Heights was built in 1997, inside the rainscreen-era window (roughly 1985–2000) when many BC buildings developed building envelope failures. Whether this specific building has been remediated, partially remediated, or still has outstanding scope can only be confirmed from the depreciation report and any engineering reports commissioned by the strata. SearchStrata reads those reports and extracts completed and outstanding envelope scope with the dollar figures discussed in minutes.

Does Dunbar Heights require a depreciation report?

Yes. Dunbar Heights has 34 units, and BC strata corporations with five or more residential strata lots are generally required to obtain a depreciation report and refresh it every five years. The report projects 30 years of major capital expenditures and is the single most important document for understanding the building's long-term financial trajectory.

Other strata buildings in Vancouver

Researching multiple buildings? These nearby strata corporations are in the same city.