Park Hyatt

1111 Alberni St

Vancouver, BC V6E 4V2 · Strata Plan BCS3165

Park Hyatt is a 234-unit strata building at 1111 Alberni St in Vancouver, BC, built in 2008, registered under strata plan BCS3165. The exterior is recorded as concrete, mixed (exterior), with a full rain screen. This page surfaces the strata registry data we have on the building plus preliminary risk signals derived from construction era, size and depreciation report status. Location Insights scores the area around the building separately. For the actual condo fees, special levy history, contingency reserve fund balance and building envelope status, you’ll need the strata document package — request it through your realtor and upload it to SearchStrata for an AI analysis.

General information

Strata registry record

Everything below is on file for this building. Coverage is uneven and much is still missing — know something we don’t? Suggest it, and a person reviews it before anything publishes.

Building / complex name
Park Hyatt
Year built
2008 (18 years old)
Strata lots (units)
234
Storeys
62
Strata plan #
BCS3165
Management company
Tribe Management
Exterior cladding
Concrete, Mixed (Exterior)
Roof
Other
Rain screen
Full rain screen
Postal code
V6E 4V2
Not on file yet (2)
Envelope remediation
unknown
Pets
unknown

Location Insights

Hazard

75/100

Measured around the building from public data. Not part of the document analysis, and not included in any report grade.

  • Wildfire threat class0 class
  • Seismic hazard (peak ground acceleration)0.483 g
  • Historical wildfire within 5 km0 ha

1 further hazard signal could not be measured here — reported as a gap, never as a zero.

Source: Historical wildfire perimeters · BC Wildfire PSTA Fire Threat Rating · Canadian National Seismic Hazard Model (NBCC 2020 values)

Preliminary risk signals

These are derived from public registry data — construction era, size and depreciation report status. They are not a substitute for reading the actual strata document package, which is where the real risks live.

  • Post-rainscreen construction (2000-2010)

    watch

    Built 2008. Generally past the worst envelope era, but post-rainscreen build quality varies. Engineering reports commissioned by the strata are the best signal.

  • Large strata (100+ units)

    info

    234 units. Costs are spread across many owners, but councils tend to be more politically active — Section 35 records and AGM minutes are typically thicker. More room for disputes about amenities, parking, and mixed-use cost sharing.

About this information

Building data is compiled from public land title, municipal, and strata registry sources. It is provided for informational purposes and is not legal, financial, or real estate advice. Always verify against the strata corporation’s official documents (Form B, bylaws, financial statements, depreciation report, minutes) before making a purchase decision.

Last enriched:

Condo fees and strata fees

Monthly fees at 1111 Alberni St are set by the strata corporation’s annual budget, approved at the AGM, and disclosed in the Form B information certificate. They cover operating costs (insurance, utilities, management, maintenance) and contributions to the Contingency Reserve Fund. To see the actual current figure and the fee trajectory over recent years, you need the budget, financial statements, and recent AGM minutes.

Special levy history

A special levy is a one-time assessment for unbudgeted capital work — envelope remediation, roofing, plumbing, parkade. The history of special levies (and the levies projected in the depreciation report) is the single best signal for what living at Park Hyatt might cost over the next 5–10 years. SearchStrata extracts the full levy history from minutes and AGM packages with page-level citations.

Reserve fund & depreciation report

As a BC strata with 234 units, this building is generally required to maintain a depreciation report refreshed every five years. The report projects 30 years of capital expenditures; the Contingency Reserve Fund (CRF) balance versus the report’s recommended contributions tells you whether owners are saving fast enough for what’s coming.

Frequently asked questions about Park Hyatt

When was Park Hyatt built?

Park Hyatt was built in 2008, making it approximately 18 years old. Construction era is a key signal in BC because buildings from the 1985–2000 rainscreen window often carry building-envelope history, while post-2010 buildings are typically still inside the 2-5-10 New Home Warranty period for structural items.

How many units are in Park Hyatt?

Park Hyatt has 234 units across 62 floors. Unit count matters because capital costs (roofing, envelope, parkade work) are split across every owner — smaller buildings concentrate cost per unit, larger ones spread it.

What is the strata plan number for Park Hyatt?

Park Hyatt is registered under strata plan BCS3165. The prefix identifies the registration era (NWS = older, EPS/BCS = newer post-2010 registrations under the Strata Property Act). The strata plan defines the boundaries of common property, limited common property, and individual strata lots and is referenced throughout the Form B information certificate and bylaws.

How can I find the condo fees and special levy history for Park Hyatt?

Current monthly condo / strata fees, the special levy history, and the contingency reserve fund balance are not in any public registry — they live in the strata corporation's document package: the Form B information certificate, financial statements, recent AGM minutes, and the depreciation report. Request the package through your realtor (or directly via the strata management company) and upload it to SearchStrata to get every figure extracted and explained with page-level citations.

Does Park Hyatt require a depreciation report?

Yes. Park Hyatt has 234 units, and BC strata corporations with five or more residential strata lots are generally required to obtain a depreciation report and refresh it every five years. The report projects 30 years of major capital expenditures and is the single most important document for understanding the building's long-term financial trajectory.

Other strata buildings in Vancouver

Researching multiple buildings? These nearby strata corporations are in the same city.