Marquise

469 King Edward Ave W

Vancouver, BC V5Y 2J3 · Strata Plan EPS7311

Marquise is a 58-unit strata building at 469 King Edward Ave W in Vancouver, BC, built in 2021, registered under strata plan EPS7311. This page surfaces the strata registry data we have on the building plus preliminary risk signals derived from construction era, size and depreciation report status. Location Insights scores the area around the building separately. For the actual condo fees, special levy history, contingency reserve fund balance and building envelope status, you’ll need the strata document package — request it through your realtor and upload it to SearchStrata for an AI analysis.

General information

Strata registry record

Everything below is on file for this building. Coverage is uneven and much is still missing — know something we don’t? Suggest it, and a person reviews it before anything publishes.

Building / complex name
Marquise
Year built
2021 (5 years old)
Strata lots (units)
58
Storeys
6
Strata plan #
EPS7311
Management company
Associa British Columbia
Postal code
V5Y 2J3
Not on file yet (5)
Exterior cladding
unknown
Roof
unknown
Rain screen
unknown
Envelope remediation
unknown
Pets
unknown
Addresses in this strata corporation (9)
  • 469 King Edward Ave W, Vancouver V5Y 2J3
  • 469 W King Edward Ave, Vancouver V5Y 2J3
  • 477 King Edward Ave W, Vancouver V5Y 2J3
  • 479 King Edward Ave W, Vancouver V5Y 2J3
  • 481 King Edward Ave W, Vancouver V5Y 2J3
  • 483 King Edward Ave W, Vancouver V5Y 2J3
  • 485 King Edward Ave W, Vancouver V5Y 2J3
  • 487 King Edward Ave W, Vancouver V5Y 2J3
  • 489 King Edward Ave W, Vancouver V5Y 2J3

Location Insights

Hazard

75/100

Measured around 469 King Edward Ave W from public data. Not part of the document analysis, and not included in any report grade.

  • Wildfire threat class0 class
  • Seismic hazard (peak ground acceleration)0.483 g
  • Historical wildfire within 5 km0 ha

1 further hazard signal could not be measured here — reported as a gap, never as a zero.

Source: Historical wildfire perimeters · BC Wildfire PSTA Fire Threat Rating · Canadian National Seismic Hazard Model (NBCC 2020 values)

Preliminary risk signals

These are derived from public registry data — construction era, size and depreciation report status. They are not a substitute for reading the actual strata document package, which is where the real risks live.

  • Newer construction (post-2010)

    info

    Built 2021. Likely still inside the 2-5-10 New Home Warranty window for structural items (10 years from occupancy). Look for active warranty disputes between strata and developer in Section 35 records.

  • Mid-size strata

    info

    58 units. Typical Metro Vancouver / Calgary / Edmonton strata size.

About this information

Building data is compiled from public land title, municipal, and strata registry sources. It is provided for informational purposes and is not legal, financial, or real estate advice. Always verify against the strata corporation’s official documents (Form B, bylaws, financial statements, depreciation report, minutes) before making a purchase decision.

Last enriched:

Condo fees and strata fees

Monthly fees at 469 King Edward Ave W are set by the strata corporation’s annual budget, approved at the AGM, and disclosed in the Form B information certificate. They cover operating costs (insurance, utilities, management, maintenance) and contributions to the Contingency Reserve Fund. To see the actual current figure and the fee trajectory over recent years, you need the budget, financial statements, and recent AGM minutes.

Special levy history

A special levy is a one-time assessment for unbudgeted capital work — envelope remediation, roofing, plumbing, parkade. The history of special levies (and the levies projected in the depreciation report) is the single best signal for what living at Marquise might cost over the next 5–10 years. SearchStrata extracts the full levy history from minutes and AGM packages with page-level citations.

Reserve fund & depreciation report

As a BC strata with 58 units, this building is generally required to maintain a depreciation report refreshed every five years. The report projects 30 years of capital expenditures; the Contingency Reserve Fund (CRF) balance versus the report’s recommended contributions tells you whether owners are saving fast enough for what’s coming.

Frequently asked questions about Marquise

When was Marquise built?

Marquise was built in 2021, making it approximately 5 years old. Construction era is a key signal in BC because buildings from the 1985–2000 rainscreen window often carry building-envelope history, while post-2010 buildings are typically still inside the 2-5-10 New Home Warranty period for structural items.

How many units are in Marquise?

Marquise has 58 units across 6 floors. Unit count matters because capital costs (roofing, envelope, parkade work) are split across every owner — smaller buildings concentrate cost per unit, larger ones spread it.

What is the strata plan number for Marquise?

Marquise is registered under strata plan EPS7311. The prefix identifies the registration era (NWS = older, EPS/BCS = newer post-2010 registrations under the Strata Property Act). The strata plan defines the boundaries of common property, limited common property, and individual strata lots and is referenced throughout the Form B information certificate and bylaws.

How can I find the condo fees and special levy history for Marquise?

Current monthly condo / strata fees, the special levy history, and the contingency reserve fund balance are not in any public registry — they live in the strata corporation's document package: the Form B information certificate, financial statements, recent AGM minutes, and the depreciation report. Request the package through your realtor (or directly via the strata management company) and upload it to SearchStrata to get every figure extracted and explained with page-level citations.

Does Marquise require a depreciation report?

Yes. Marquise has 58 units, and BC strata corporations with five or more residential strata lots are generally required to obtain a depreciation report and refresh it every five years. The report projects 30 years of major capital expenditures and is the single most important document for understanding the building's long-term financial trajectory.

Other strata buildings in Vancouver

Researching multiple buildings? These nearby strata corporations are in the same city.