Vancouver · elementary catchment
Strata buildings in the Hastings catchment
357 strata addresses in Vancouver fall inside the Hastings catchment — 146 strata corporations, about 2,256 homes. This is the attendance area School District No. 39 (Vancouver) drew, not a list of buildings that happen to be near the school.
- Addresses
- 357
- Corporations
- 146
- Homes
- 2,256
- Grades
- elementary
Where the Hastings catchment reaches
A catchment is drawn around a school; a neighbourhood is drawn around everything else. This one covers 2 of Vancouver's local areas.
Strata addresses in this catchment
Showing 48 of 357Each card opens the building's public registry profile. SearchStrata's risk analysis runs only on documents you upload — these directory pages record what a building is, and do not rate the corporation.
11 Kaslo St
Vancouver
EPS9520Garden Views — 120 Garden Dr
Vancouver
Built 199314 unitsLMS872Garden Views — 120 Gdn Dr
Vancouver
Built 199314 unitsLMS872Lakewood Place — 122 Lakewood Dr
Vancouver
Built 19906 unitsVAS2804123 Nanaimo St N
Vancouver
Built 2002BCS50Lakewood Place — 126 Lakewood Dr
Vancouver
Built 19906 unitsVAS2804Lakewood Place — 128 Lakewood Dr
Vancouver
Built 19906 unitsVAS2804Lakewood Place — 130 Lakewood Dr
Vancouver
Built 19916 unitsVAS2804Lakewood Place — 132 Lakewood Dr
Vancouver
Built 19906 unitsVAS2804Lakewood Place — 136 Lakewood Dr
Vancouver
Built 19906 unitsVAS2804Elisa — 138 Templeton Dr
Vancouver
Built 197512 unitsVAS187Copper Place — 16 Lakewood Dr
Vancouver
Built 198120 unitsVAS956189 Nanaimo St
Vancouver
Built 2003BCS30219 Renfrew St N
Vancouver
Built 200810 unitsBCS27691901 Franklin St
Vancouver
Built 2019EPS56431910 Pandora St
Vancouver
Built 2019EPS56431911 Franklin St
Vancouver
Built 2019EPS56431920 Pandora St
Vancouver
Built 2019EPS56431930 Pandora St
Vancouver
Built 2019EPS56431931 Franklin St
Vancouver
Built 2019EPS56431950 Pandora St
Vancouver
Built 2019EPS56431951 Franklin St
Vancouver
Built 2019EPS56431960 Pandora St
Vancouver
Built 2019EPS56431970 Pandora St
Vancouver
Built 2019EPS56431971 Franklin St
Vancouver
Built 2019EPS56431980 Pandora St
Vancouver
Built 2019EPS56431990 Pandora St
Vancouver
Built 2019EPS56431991 Franklin St
Vancouver
Built 2019EPS5643Nanaimo West — 2 Nanaimo St
Vancouver
Built 20186 unitsEPS4026Cannery Row — 2001 Wall St
Vancouver
Built 199868 unitsLMS30622002 Franklin St
Vancouver
Built 201110 unitsBCS4077Hastings Court — 2003 Hastings St E
Vancouver
Built 201011 unitsBCS39012006 Franklin St
Vancouver
Built 201110 unitsBCS4077Hastings Court — 2007 Hastings St E
Vancouver
Built 201011 unitsBCS39012007 Pender St E
Vancouver
Built 2002BCS265Hastings Court — 2009 E Hastings St
Vancouver
Built 201011 unitsBCS3901Hastings Court — 2009 Hastings St E
Vancouver
Built 201011 unitsBCS39012010 Franklin St
Vancouver
Built 201110 unitsBCS40772016 Franklin St
Vancouver
Built 201110 unitsBCS40772018 Franklin St
Vancouver
Built 201110 unitsBCS40772023 Franklin St
Vancouver
Built 199027 unitsVAS26842032 Franklin St
Vancouver
Built 2018EPS48122033 Triumph St
Vancouver
Built 197556 unitsVAS2632036 Franklin St
Vancouver
Built 2018EPS48122038 Franklin St
Vancouver
Built 2018EPS48122038 Triumph St
Vancouver
Built 2004BCS10112042 Triumph St
Vancouver
Built 2004BCS1011Harbour Mount — 2045 Franklin St
Vancouver
Built 198331 unitsVAS1345
This catchment holds 357 strata addresses — more than one page should list. Search the Vancouver directory for a specific one.
A catchment is not a verdict on the building
Every address above is inside the same elementary school boundary and that is the only thing they have in common. Two towers on one block can be a decade apart on their envelope, a hundred thousand dollars apart on their reserve fund, and one special levy apart on what the next two years cost an owner.
In Vancouver strata packages we routinely see: special levy history tied to envelope, roof, or balcony work in 1990s–2000s buildings; CRF balances that look healthy on paper but are below the contributions recommended by the most recent depreciation report; ongoing or recently resolved litigation between owners and council (read every Section 35 record); short-term-rental and pet bylaws that have changed materially in the last 3–5 years; and insurance deductibles for water damage that have crept up significantly since the 2020 commercial insurance hardening.
Looking a building up is free. Add its strata package — minutes, financials, depreciation report, Form B, bylaws — and the reserve fund, the levy history and the litigation come back as findings, each cited to the page it came from.
Where this comes from
Hastings catchment: Vancouver elementary school catchments (SD39), Vancouver School Board. Terms not stated by the publisher
School catchments are the attendance boundaries the school district published. Districts review and redraw them, and placement is the district's decision, not ours — confirm the current catchment with the district before it matters to a purchase.
Buying inside the Hastings catchment?
The catchment is settled. What the building will cost you is not — and it is all in the package. Analyze one in minutes.
Building intelligence, in three parts
The building, the neighbourhood around it, and its own documents. The building is free and needs no account — its facts were already public.
1 · Free, no account
The building
What you’re buying into
Built of, year, storeys, homes, who manages it, what's been remediated. Assembled from land title, the assessment roll and strata filings. No account.
19,000+ BC corporations · $0
Search the record2 · Pro
The neighbourhood
What you can’t change
Nine areas past the lot line, measured from public BC data — transit, schools, hazard, crime, what's approved next door. Never in the building's own paperwork.
Location Insights · Pro
How Location Insights works3 · Upload
The documents
What you’re inheriting
The levies, the reserve fund, the litigation, the engineer's schedule — read out of this corporation's own package, each finding pointing at its page.
Your documents · deep analysis
See plans