Vancouver · elementary catchment
Strata buildings in the Osler catchment
184 strata addresses in Vancouver fall inside the Osler catchment — 19 strata corporations, about 567 homes. This is the attendance area School District No. 39 (Vancouver) drew, not a list of buildings that happen to be near the school.
- Addresses
- 184
- Corporations
- 19
- Homes
- 567
- Grades
- elementary
Where the Osler catchment reaches
A catchment is drawn around a school; a neighbourhood is drawn around everything else. This one covers 2 of Vancouver's local areas.
Strata addresses in this catchment
Showing 48 of 184Each card opens the building's public registry profile. SearchStrata's risk analysis runs only on documents you upload — these directory pages record what a building is, and do not rate the corporation.
Oak Gardens — 1001 43rd Ave W
Vancouver
Built 199345 unitsLMS1519The Carrington — 1001 46th Ave W
Vancouver
Built 200930 unitsBCS3353The Carrington — 1002 45th Ave W
Vancouver
Built 200930 unitsBCS3353Rowen W47 — 1002 47th Ave W
Vancouver
36 unitsEPS105321002 W 37th Ave
Vancouver
68 unitsEPS12152The Carrington — 1003 46th Ave W
Vancouver
Built 200930 unitsBCS3353Rowen W47 — 1004 47th Ave W
Vancouver
36 unitsEPS10532Grand On Oak — 1006 43rd Ave W
Vancouver
Built 200931 unitsBCS3651The Carrington — 1006 45th Ave W
Vancouver
Built 200930 unitsBCS3353Rowen W47 — 1006 47th Ave W
Vancouver
36 unitsEPS105321006 W 37th Ave
Vancouver
Built 2026The Carrington — 1007 46th Ave W
Vancouver
Built 200930 unitsBCS3353Grand On Oak — 1008 43rd Ave W
Vancouver
Built 200931 unitsBCS3651The Carrington — 1008 45th Ave W
Vancouver
Built 200930 unitsBCS3353Rowen W47 — 1008 47th Ave W
Vancouver
36 unitsEPS105321008 52nd Ave W
Vancouver
6 unitsEPS110101008 W 47th Ave
Vancouver
Built 20241008 W 52nd Ave
Vancouver
Built 20256 unitsEPS11010The Carrington — 1009 46th Ave W
Vancouver
Built 200930 unitsBCS3353Oak Gardens — 1010 42nd Ave W
Vancouver
Built 199345 unitsLMS1519Grand On Oak — 1010 43rd Ave W
Vancouver
Built 200931 unitsBCS3651The Carrington — 1010 45th Ave W
Vancouver
Built 200930 unitsBCS3353Rowen W47 — 1010 47th Ave W
Vancouver
36 unitsEPS105321010 48th Ave W
Vancouver
Built 1972VAS491010 52nd Ave W
Vancouver
6 unitsEPS11010Oak Gardens — 1010 W 42nd Ave
Vancouver
Built 199345 unitsLMS1519The Carrington — 1011 46th Ave W
Vancouver
Built 200930 unitsBCS3353The Carrington — 1012 45th Ave W
Vancouver
Built 200930 unitsBCS3353Rowen W47 — 1012 47th Ave W
Vancouver
36 unitsEPS105321012 52nd Ave W
Vancouver
6 unitsEPS11010Rowen W47 — 1012 W 47th Ave
Vancouver
Built 202436 unitsEPS105321012 W 52nd Ave
Vancouver
Built 20256 unitsEPS11010The Carrington — 1013 46th Ave W
Vancouver
Built 200930 unitsBCS3353Rowen W47 — 1014 47th Ave W
Vancouver
36 unitsEPS10532Grand On Oak — 1016 43rd Ave W
Vancouver
Built 200931 unitsBCS3651The Carrington — 1016 45th Ave W
Vancouver
Built 200930 unitsBCS3353Rowen W47 — 1016 47th Ave W
Vancouver
36 unitsEPS105321016 48th Ave W
Vancouver
Built 1972VAS491016 52nd Ave W
Vancouver
6 unitsEPS11010The Carrington — 1016 W 45th Ave
Vancouver
Built 200930 unitsBCS3353The Carrington — 1017 46th Ave W
Vancouver
Built 200930 unitsBCS3353Grand On Oak — 1018 43rd Ave W
Vancouver
Built 200931 unitsBCS3651The Carrington — 1018 45th Ave W
Vancouver
Built 200930 unitsBCS3353Rowen W47 — 1018 47th Ave W
Vancouver
36 unitsEPS10532Grand On Oak — 1020 43rd Ave W
Vancouver
Built 200931 unitsBCS3651Rowen W47 — 1020 47th Ave W
Vancouver
36 unitsEPS10532Rowen W47 — 1022 47th Ave W
Vancouver
36 unitsEPS10532Rowen W47 — 1024 47th Ave W
Vancouver
36 unitsEPS10532
This catchment holds 184 strata addresses — more than one page should list. Search the Vancouver directory for a specific one.
A catchment is not a verdict on the building
Every address above is inside the same elementary school boundary and that is the only thing they have in common. Two towers on one block can be a decade apart on their envelope, a hundred thousand dollars apart on their reserve fund, and one special levy apart on what the next two years cost an owner.
In Vancouver strata packages we routinely see: special levy history tied to envelope, roof, or balcony work in 1990s–2000s buildings; CRF balances that look healthy on paper but are below the contributions recommended by the most recent depreciation report; ongoing or recently resolved litigation between owners and council (read every Section 35 record); short-term-rental and pet bylaws that have changed materially in the last 3–5 years; and insurance deductibles for water damage that have crept up significantly since the 2020 commercial insurance hardening.
Looking a building up is free. Add its strata package — minutes, financials, depreciation report, Form B, bylaws — and the reserve fund, the levy history and the litigation come back as findings, each cited to the page it came from.
Where this comes from
Osler catchment: Vancouver elementary school catchments (SD39), Vancouver School Board. Terms not stated by the publisher
School catchments are the attendance boundaries the school district published. Districts review and redraw them, and placement is the district's decision, not ours — confirm the current catchment with the district before it matters to a purchase.
Buying inside the Osler catchment?
The catchment is settled. What the building will cost you is not — and it is all in the package. Analyze one in minutes.
Building intelligence, in three parts
The building, the neighbourhood around it, and its own documents. The building is free and needs no account — its facts were already public.
1 · Free, no account
The building
What you’re buying into
Built of, year, storeys, homes, who manages it, what's been remediated. Assembled from land title, the assessment roll and strata filings. No account.
19,000+ BC corporations · $0
Search the record2 · Pro
The neighbourhood
What you can’t change
Nine areas past the lot line, measured from public BC data — transit, schools, hazard, crime, what's approved next door. Never in the building's own paperwork.
Location Insights · Pro
How Location Insights works3 · Upload
The documents
What you’re inheriting
The levies, the reserve fund, the litigation, the engineer's schedule — read out of this corporation's own package, each finding pointing at its page.
Your documents · deep analysis
See plans